Ward: St James's
Streets Affected: Palmer Street
Project Type: Streetscape
Project Overview
The Council carried out footway works on Palmer Street.
The previous footway consisted of a mixture of paving slabs, and asphalt which had deteriorated due to ageing. Palmer Street also had a drainage problem on the footway which caused flooding after periods of rainfall.
The improvement works included the following: -
- Repaving the existing footway with York stone paving.
- Relaying existing drainage channel to improve footway drainage
- High pressure water jetting of the existing drainage sewer
Status
Works completed
Outline Programme
Construction completed in October 2010