Tachbrook Street Market Electrical Upgrade

Tachbrook Street Market Electrical Upgrade

Ward: Tachbrook

Streets Affected: Churton Street Private Section, Tachbrook Street, Warwick Way

Project Type: Streetscape

Project Overview

Tachbrook Street Market, situated on the pedestrianised section of Tachbrook Street between Warwick Way and Churton Street is proposed to have its electrical equipment upgraded. The ageing bollards which provide the electricity supply to the market traders are in need of replacing from a health and safety point of view. The existing market is to be relocated to Upper Tachbrook Street for the duration of these works. To accommodate the temporary relocation of the market to this space, the section of Upper Tachbrook Market between Longmoore Street and Warwick Way will be closed to traffic.

Status

Works completed

Outline Programme

Works to Tachbrook Street (between Warwick Way and Churton Street):
Approximate Start Date: 25/01/2021
Approximate End Date: 02/04/2021

Project Documents

There are no documents available for this project

STATUS

    On Hold
    Design Stage
    In Consultation
    Works on site
    Works completed